IMG 1894-e-7
These spillway outlets use part of the original diversion tunnels built during the dam's construction
DATE: 7/2/05 1:03 PM   |   CAMERA: Canon (Canon PowerShot S50)   |   ORIGINAL RESOLUTION: 1944 x 2592   |   FLASH: Flash did not fire, auto   |   EXPOSURE TIME: 1/400s   |   SHUTTER SPEED: 1/403 sec   |   METERING MODE: Center weighted average   |   APERTURE: 4.9   |   FOCAL LENGTH: 21.3mm   |   EXPOSURE MODE: Program   |   EXPOSURE BIAS: 0 EV   |   ISO SETTING: Auto   |   WHITE BALANCE: Auto   |  


Download original image (2.51 MB)

Generated by Jalbum 8.5

Copyright © 12-Foot Hedgehog Productions. See this page for licensing information.